Design consultation, project management and inspection associated with the WD 117-H jacket, deck and pipelines. Project consisted of fabrication of one (1) 4-pile jacket installed in a water depth of 201′, refurbishment and installation of deck and equipment needed to support multiple wells flowing back to nearby processing platform. Installation of three (3) 6″ infield flow lines each one (1) mile in length, one (1) mile 6″ gas export pipeline, and one (1) three (3) mile 10″ oil export pipeline.