Managing both onshore and offshore projects for the chemical, oil and gas industry.
Whether your project involves a small onshore facility or station, or a major plant or offshore structure, RCI has the experience and resume to be an asset to your team. We work throughout the US and in several international locations, delivering the project management expertise you need.
Our project experiences individually, and as a team, touch nearly every aspect of the energy community, from facility design and pipeline construction to handling the most routine RFPs and negotiations with project suppliers for our clients. RCI is a valuable member to any team. Our project managers and inspectors have extensive experience in all aspects of onshore, offshore and industrial construction, from grassroots mid-continent gas and liquids processing and compression facilities to the energy industry’s maintenance, expansion and turnaround projects. We routinely handle field development projects including field development concept planning, overseeing the detailed engineering efforts, and providing management of the fabrication and installation of the facility, structure and pipelines. RCI is also involved in the continued maintenance operations and decommissioning and salvage efforts at the end of the facility’s life.
Design consultation and review, project management and inspection services for all aspects of this project, Williams’ first process facility in the Gulf of Mexico.
Read MoreProject management and inspection services for onshore refurbishment and offshore installation of a replacement structure. The original facility was severely damaged when hit by a cargo barge.
Read MoreDesign consultation, project management and inspection associated with a spool piece re-route of a 24" pipeline around the "Y-49" power cable crossing in Long Island Sound, New York.
Read MoreDesign consultation, project management and inspection services for an "A" junction platform, a 4-legged, 4-skirt pile jacket set in a water depth of 363' with a 3-level deck.
Read MoreDesign consultation, project management cost tracking and inspection associated with the fabrication of a tripod jacket and refurbishment of a 15MMscf/day production deck.
Read MoreConstruction and installation of four caissons in the MI 656 and 632 areas, tying in all production to either the existing MI 657 “B” platform or MI 632 “A” platform.
Read MoreRefurbishment of the existing WD 102 “G” tripod jacket and deck to be used in a two-well development at EI 318 in 240’ of water.
Read MoreRCI’s in-house project management group spearheaded the Chevron Hurricane Restoration Team efforts in the Gulf of Mexico.
Read MoreProject management and inspection associated with determination of quantity and extent of soil scour around and under the 24" pipeline system crossing in Long Island Sound, New York.
Read MoreDue to severe damage to facilities from Hurricanes Ivan and Rita, RCI provided project management and inspection services on both occasions, with the goal of timely and safe repair to bring this critical facility back into production.
Read MoreDesign consultation, project management and inspection associated with the WD 117-H jacket, deck and pipelines.
Read MoreRCI provided the majority of the construction support and inspection team supplying multi-disciplined local personnel at a number of the project work sites.
Read MoreIn the Gulf of Mexico, approximately 150 miles south of Houston, both Nansen and Boomvang were developed with the world's first truss SPARs, replacing the lower cylindrical hull in order to reduce weight and cost.
Read MoreProject management and technical consulting services for fabrication of the compliant tower structure, template and piles for the project at the Kiewit and Gulf Marine Fabricators yards in Ingleside, Texas.
Read MoreRCI Project engineers and project field coordinators worked on two of Anadarko's subsea developments in approximately 4,100' of water to tie them back to the Marco Polo Facility in approximately 4,300' of water.
Read MoreCanyon Express was comprised of several companies that made a decision to produce three marginal fields through one subsea piggable pipeline loop to a new build host facility. The water depth of these fields ranged from 6,600' to 7,200'. Williams was selected to fabricate, install, and operate the Host Facility.
Read MoreThese projects were part of the major expansions to the Discovery system with Williams' Tahiti pipeline project for Chevron's Tahiti discovery in the central region; and installation of export oil and gas pipelines for Chevron's Blind Faith discovery in the eastern region in Mississippi Canyon blocks 695 and 696.
Read MoreLocated approximately 180 miles south of the Louisiana coast, these fields were initially developed with two subsea wells in Cascade and one subsea well in Chinook. The FPSO features a disconnectable turret buoy (allowing it to be moved offsite during severe weather events) and is moored by a polyester mooring system linked to torpedo piles and vertically loaded anchors.
Read MorePetrobras's first subsea development project in the Gulf of Mexico and also the first field in deep waters developed and put into production by Petrobras, as operator, outside Brazil.
Read MoreManaged the construction activities of this new grassroots facility.
Read MoreRCI provided the complete site management and inspection team for Chevron Pipeline’s Port Arthur Line Optimization Project (PALO).
Read MoreDesign consultation and review, project management and inspection services for all aspects of this project.
Read MoreDesign consultation, project management and inspection for the multiphase replacement/refurbishment of four Solar Centaur 30 recuperated type turbines with Solar Centaur 40 simple cycle and SoloNox turbines.
Read MoreThe Stingray gas processing plant in Johnson’s Bayou was severely damaged during Hurricane Rita, with storm surge damaging all I&E components and causing severe structural and processing equipment damage.
Read MoreProject management and quality control services for the design, engineering and construction of a 16” diameter 4,000-foot lateral line extending from the TEPPCO P6 and P62, 16” and 20” product transmission lines to deliver up to 10,000 barrels/hour of gasoline, diesel and jet fuel to an existing Murphy Oil storage facility.
Read MoreInstrumental in planning and executing a planned shutdown of the facility to facilitate various maintenance operations.
Read MoreInspection and assessment services on a 42-inch pipeline road crossing.
Read MoreConducted a seismic walk-through assessment of bpTT’s Galeota and Beachfield facilities in the act of assessing the seismic preparedness of the terminals.
Read MoreOnsite inspection services, HSE representation and document control on this plant expansion.
Read MoreOn-site project management, inspection and HSE representation on the DCP Midstream Carthage plant expansion, which underwent multiple upgrades while remaining in operation.
Read MoreInspection and consultation associated with a 24" pipeline crossing of the Hampton Roads Harbor utilizing five horizontal directional drilled segments.
Read MoreThis onshore oil and gas-receiving terminal at Galeota Point is located on the southeastern tip of the island of Trinidad. The facility is bordered on its eastern side by the Atlantic Ocean, a narrow beach and a sheet pile wall. Erosion activity was impacting the integrity of the wall and repair options were identified.
Read MoreRCI`s leading project management team has provided years of consulting and technical expertise to global companies in the energy industry.