Canyon Express was an entity that was comprised of several companies that made a decision to produce three (3) marginal fields through one subsea piggable pipeline loop to new build host facility. The three fields and operators were:
BP Kings Peak MC173 & 217/DC 133&177
Marathon Camden Hills MC348
Total Aconcagua MC305
The water depth of these fields ranged from 6,600′ to 7,200′. Gas flow rate designed for is 500 mmcfd. Williams was selected to fabricate, install, and operate the Host Facility (Canyon Station).